Paint and Coatings Industry Standards


OSHA (89)

Search Standards | Back to all Standards


Hazardous Material (46)

- Asbestos

- Lead

- Spray finishing using flammable and combustible materials.

- Storage and handling of liquefied petroleum gases

- Hazardous waste operations and emergency response

- Personal protective equipment test methods

- General description and discussion of the levels of protection and protective gear.

- Hazard Communication

- Guidelines for Employer Compliance (Advisory)

- Dipping and coating operations: Coverage and definitions

- General requirements for dipping and coating operations

- Additional requirements for dipping and coating operations that use flammable or combustible liquids

- Additional requirements for special dipping and coating operations

- Fit Testing Procedures (Mandatory).

- Specifications for accident prevention signs and tags

- Occupational exposure to hazardous chemicals in laboratories.

- Permit-required confined spaces

- Examples of Permit-required Confined Space Programs

- Longshoring and marine terminals.

- Definitions Applicable to this subpart

- Powered platforms for building maintenance

- Personal Fall Arrest System (Section I - Mandatory; Sections II and III - Non-Mandatory)

- Ventilation

- Flammable and combustible liquids

- Compliance Guidelines

- Occup. Safety and Health Standards for Shipyard Employment

- Compliance Assistance Guidelines for Confined and Enclosed Spaces and Other Dangerous Atmospheres

- Air contaminants

- Asbestos

- OSHA Reference Method - Mandatory

- Detailed Procedure for Asbestos Sampling and Analysis - Non-Mandatory

- Qualitative and Quantitative Fit Testing Procedures - Mandatory

- Substance technical information for Asbestos - Non-Mandatory

- Use of gear

- Fire Protection in Shipyard Employment

- Welding, cutting and heating (hot work) (See also § 1917.2, definition of Hazardous cargo, materials, substance or atmosphere).

- Spray painting

- Guidelines for Employer Compliance (Advisory)

- Sample Fall Protection Plan - Non-Mandatory Guidelines for Complying with 1926.502(k)

- Hazardous waste operations and emergency response.

- Personal Protective Equipment Test Methods

- General Description and Discussion of the Levels of Protection and Protective Gear

- Compliance Guidelines

- Criteria for design and construction of spray booths

- Underground Construction

- Compressed air


(Back to all Standards)