Paint BidTracker

(800) 837-8303
sales@paintbidtracker.com

The Technology Publishing Network
JPCL | PaintSquare | Durability + Design Paint BidTracker

Sign-up for a Free Trial...or Login
Email/Username* Password*
Follow us on Twitter  |   Join us on Facebook
About Paint BidTracker | Contact Us | Advertise | Search

Paint and Coatings Industry News

Main News Page


Improvements Needed for Memorial Stadium

Tuesday, January 9, 2018

Comment | More

The University of Nebraska is soliciting contractors for the construction of two men’s restrooms, two women’s restrooms and four concession stands in the North 300 level concourse of Memorial Stadium in Lincoln, Nebraska.

Bids are due Jan. 16.

Scope of Work

The project includes coating interior concrete surfaces with semi-gloss latex enamel, high-performance latex block filler and semi-gloss latex odorless enamel systems. Interior ferrous metal will be coated with semi-gloss waterborne enamel, acrylic rust-inhibiting primer and interior enamel undercoat systems. Interior gypsum drywall surfaces will be coated with semi-gloss latex, latex interior white primer and semi-gloss latex finish systems.

Bobak Ha'Eri, CC-SA-BY 3.0, via Wikimedia Commons

The University of Nebraska is soliciting contractors for the construction of two men’s restrooms, two women’s restrooms and four concession stands in the North 300 level concourse of Memorial Stadium in Lincoln, Nebraska.

The project also includes coating exposed surfaces including but not limited to metal and plastic piping, hangers and supports, switchgear, panelboards and miscellaneous factory primed equipment requiring field coatings.

Owner-approved manufacturers are as follows: Benjamin Moore, BASF (ChemRex), Behr (Sterling), Davis Paint, Del Technical Coatings, Diamond Vogel, Envirocoat, ICI Devoe, ICI Dulux, ICI Paints, Insul-x, NCP Coatings, Olympic Stains, PPG (Porter), Pratt & Lambert Inc., Sherwin-Williams, Smiland Paint Company and Vista Paint.

The stadium is home to the NCAA Division I Nebraska Cornhuskers football team, and as of Nov. 24, 2017, has had 361 sellout games in a row. It has been referred to as one the “Cathedrals of College Football.”

Built in 1923, the stadium originally held 31,000 people. Now, the stadium has a capacity of 85,458. The stadium has undergone numerous improvements in its 95 years of existence including being the first on-campus stadium to feature replay boards. In 1997, the stadium underwent a two-year, $36 million renovation that included the construction of 42 suites, club seating, as well as increasing the number of additional restrooms and concession areas.

In addition to being a home to the Cornhuskers, the stadium also serves as a tribute and memorial to Nebraskan veterans. Each corner of the stadium features quotes of University of Nebraska professor Hartley Burr Alexander.

Reported by Paint BidTracker, a construction reporting service devoted to identifying contracting opportunities for the coatings community. Try Paint BidTracker free!

   

Tagged categories: Bidding; Contract awards; Government; Government contracts; Jobs; Paint BidTracker

Comment Join the Conversation:

Sign in to our community to add your comments.

Sherwin-Williams
Lower Cost, Long-Term Asset Protection

Designed for long-term protection in highly corrosive environments, Sherwin-Williams’ Sher-Loxane™ 800 High-Performance Polysiloxane coating delivers a high-gloss finish in just two coats – reducing total operational costs for a better bottom line.


Clemco Industries Corp.
Maximum Dust Suppression Systems Start at $14,950

The system comprises proven technology and equipment with user-friendly flexibility in mind. See it in action.


Marine Equipment Supply
MES - Rentals & Supplies

Need to rent or buy surface prep equipment and consumables? We're your nationwide one stop shop. 888-281-2643

Technology Publishing

The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 
USE Paint BidTracker:      Get a Free Trial
 
EXPLORE Paint BidTracker:      Project Showcase   |   Blogs   |   Social   |   News   |   Webinars   |   White Papers   |   Links   |   Standards   |   Classifieds
 
KNOW Paint BidTracker:      FAQ   |   About Paint BidTracker   |   Privacy policy   |   Terms & conditions   |   Site Map   |   Search   |   Contact Us
 

© Copyright 2000 - 2018, Technology Publishing, Co., All rights reserved
1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233; Tel 1-412-431-8300; Fax 1-412-431-5428; E-mail webmaster@paintsquare.com